Blackwell GPU reservationsRequest capacity

    Frontier compute.
    In ~3 months.

    Dedicated NVIDIA Blackwell GPU clusters for training and inference.

    Choose how
    you deploy.

    Your own GPU cluster.

    Dedicated NVIDIA compute. Your GPU, cluster size and orchestration.

    NVIDIA Blackwell.

    From a server GPU to a complete NVLink rack.

    NVIDIA DGX B300 system, showing its gold front panel and chassis
    NVIDIA DGX B300 reference system

    NVIDIA B300

    Blackwell Ultra for demanding training runs and reasoning workloads.

    Architecture
    Blackwell Ultra
    GPU memory
    HBM3e
    Platform
    8-GPU NVLink system

    $4.25 / GPU-hour

    USD · 3-year reservation

    Architectural illustration of a data hall between rows of server racks

    Beyond
    the GPU.

    Power, cooling and connectivity.
    Planned as one.

    Explore the facility

    From agreement
    to deployment.

    A target of about three months.

    Timing depends on configuration and site readiness. Confirm the schedule in your agreement.

    1. Agree the scope

      Confirm your capacity, hardware and site requirements. Set the delivery schedule in your agreement.

    2. Engineer the deployment

      Plan power, cooling and connectivity around the hardware and its operating requirements.

    3. Build and integrate

      Prepare the facility and bring the electrical, cooling and network systems together.

    4. Validate and hand over

      Commission the infrastructure, complete acceptance checks and hand over the deployment.

    Power is part
    of the product.

    Energy supply and cooling.
    Planned alongside your compute.

    Our sustainability approach
    Illustrative power infrastructure
    Renewable supply
    Long-term power agreements support renewable supply. The mix varies by site and over time.
    Closed-loop cooling
    Facility cooling is designed without evaporative water consumption.
    Site efficiency
    PUE depends on load and operating conditions. Review the figures for your deployment.

    Our planned
    U.S. footprint.

    Reserved power
    1,346 MW
    Planned sites
    18

    Utah

    Washington, Wasatch Front & Vernal

    946MW reserved
    across 7 sites

    Plan your deployment.